Temporary Builders Supply Blue Mountains
Safe, metered site power on steep and bushy sites, connected to the Endeavour Energy network.
Building in the Mountains is different. Sites are steep and rocky, access is often a narrow road or a long driveway, and many blocks are surrounded by bush. Whether it’s a rebuild after fire, a new home on a vacant block or a major renovation, the trades need safe, metered power from day one. A temporary builders supply gives them that, connected properly to the Endeavour Energy network.
What gets installed
Usually a temporary pole or freestanding site board near the street, with a meter, main switch, safety switches and weatherproof outlets. It connects overhead from the nearest street pole, or from a pit where the street is underground. On steep blocks that fall away from the road, we place it on the most level practical spot near the frontage, and plan a sub-board or leads down to the build area.
Bush blocks
We keep the site supply clear of vegetation where possible and away from where machinery works. Cables are run so they don’t lie in leaf litter or get buried by spoil.
The right order
- Permanent disconnection of any existing building
- Site supply installed the same visit
- Build on site power
- Permanent supply connected to the new meter board
- Site supply removed
Our power disconnection and reconnection page covers step 1. If the new home is all-electric, lodge the three phase power application early.
Fire rebuilds
Homes being rebuilt after fire often have damaged or removed supplies. We make the network side safe, set up site power and plan the permanent supply, often underground, so the new home isn’t relying on an overhead line through regrowth.
What we need
- Address, builder contact and site plan
- Access notes: road width, driveway, parking
- Single or three phase
- Start date
- A retailer account for the site
Weather
Cold, wet, misty winters and summer storms are hard on site equipment. If a storm damages the site supply, keep clear and call us.
At handover
We connect the permanent supply, test and certify, then remove the temporary pole or board.
Safety on site
Site boards and temporary poles get bumped by machinery, splashed with concrete and soaked by Mountains rain. We install them to cope, with the safety switches and protection the rules require. If an overhead line runs near the work area, we can advise on keeping excavators, cranes and concrete pumps clear of it, and arrange for the line to be isolated or moved during the riskiest stages.
Moving it mid-build
When the driveway goes in or landscaping starts, the site supply sometimes has to move. We relocate it with a short disconnection if we know a few days ahead.
Common hold-ups
Most delays come from paperwork: no retailer account for the site, so no meter; the temporary pole placed where the slab or driveway goes; single phase ordered when the all-electric home needs three; or demolition booked before the old supply is disconnected. We go through each at the start so the trades have power from the first day.
Access in the Mountains
Narrow roads, tight driveways and steep sites limit where trucks can go. We plan our access and the supply position around the builder’s deliveries.
Winter builds
Cold, wet weather slows builds and is hard on site equipment. We check site boards are sealed and protected, and if water gets in, the trades should stop using it and call us.
Fire rebuild paperwork
On fire-affected blocks, we give the builder written confirmation that the old supply has been made safe, which is often needed before the clean-up and rebuild can start.
Book site power
Builders in level 2 electrician Winmalee, Springwood and across the Mountains use us. Call the Blue Mountains level 2 electrician team.
Updated
What good temporary builders supply looks like
Temporary Builders Supply across Blue Mountains
Temporary Builders Supply in Blue Mountains: step by step
- Find a safe spotWe place the supply near the street, clear of machinery, slope and vegetation.
- PaperworkEndeavour Energy is notified by us, and you get the exact wording to give your retailer for the site meter.
- InstallTemporary pole or board installed, connected and tested.
- Change overNew home connected at handover; site supply removed.
Related services
Power Disconnection and ReconnectionSafe disconnection and reconnection of the network supply for renovations, demolitions, re-roofing and switchboard work.
Three Phase Power UpgradeUpgrading a single-phase home to three phase power for EV chargers, ducted air conditioning, pools and big renovations.
Temporary Builders Supply questions in Blue Mountains
Something else on your mind? Call 02 9158 9989 and ask.
Our block falls away steeply from the road. Where does site power go?
Usually near the street, on the most level practical spot, with leads or a sub-board down to the build. We plan it with your builder.
Can the temporary pole be near the bush?
We keep it as clear of vegetation as the site allows and away from where machinery works.
Who sets up the meter?
You open a retailer account for the site; the retailer arranges the meter.