Building in the Mountains is different. Sites are steep and rocky, access is often a narrow road or a long driveway, and many blocks are surrounded by bush. Whether it’s a rebuild after fire, a new home on a vacant block or a major renovation, the trades need safe, metered power from day one. A temporary builders supply gives them that, connected properly to the Endeavour Energy network.

What gets installed

Usually a temporary pole or freestanding site board near the street, with a meter, main switch, safety switches and weatherproof outlets. It connects overhead from the nearest street pole, or from a pit where the street is underground. On steep blocks that fall away from the road, we place it on the most level practical spot near the frontage, and plan a sub-board or leads down to the build area.

Bush blocks

We keep the site supply clear of vegetation where possible and away from where machinery works. Cables are run so they don’t lie in leaf litter or get buried by spoil.

The right order

  1. Permanent disconnection of any existing building
  2. Site supply installed the same visit
  3. Build on site power
  4. Permanent supply connected to the new meter board
  5. Site supply removed

Our power disconnection and reconnection page covers step 1. If the new home is all-electric, lodge the three phase power application early.

Fire rebuilds

Homes being rebuilt after fire often have damaged or removed supplies. We make the network side safe, set up site power and plan the permanent supply, often underground, so the new home isn’t relying on an overhead line through regrowth.

What we need

  • Address, builder contact and site plan
  • Access notes: road width, driveway, parking
  • Single or three phase
  • Start date
  • A retailer account for the site

Weather

Cold, wet, misty winters and summer storms are hard on site equipment. If a storm damages the site supply, keep clear and call us.

At handover

We connect the permanent supply, test and certify, then remove the temporary pole or board.

Safety on site

Site boards and temporary poles get bumped by machinery, splashed with concrete and soaked by Mountains rain. We install them to cope, with the safety switches and protection the rules require. If an overhead line runs near the work area, we can advise on keeping excavators, cranes and concrete pumps clear of it, and arrange for the line to be isolated or moved during the riskiest stages.

Moving it mid-build

When the driveway goes in or landscaping starts, the site supply sometimes has to move. We relocate it with a short disconnection if we know a few days ahead.

Common hold-ups

Most delays come from paperwork: no retailer account for the site, so no meter; the temporary pole placed where the slab or driveway goes; single phase ordered when the all-electric home needs three; or demolition booked before the old supply is disconnected. We go through each at the start so the trades have power from the first day.

Access in the Mountains

Narrow roads, tight driveways and steep sites limit where trucks can go. We plan our access and the supply position around the builder’s deliveries.

Winter builds

Cold, wet weather slows builds and is hard on site equipment. We check site boards are sealed and protected, and if water gets in, the trades should stop using it and call us.

Fire rebuild paperwork

On fire-affected blocks, we give the builder written confirmation that the old supply has been made safe, which is often needed before the clean-up and rebuild can start.

Book site power

Builders in level 2 electrician Winmalee, Springwood and across the Mountains use us. Call the Blue Mountains level 2 electrician team.

Updated

Site supply is priced on the pole or board type, single or three phase, the connection point and site access, and how it's removed or converted at the end. We confirm on site.

What good temporary builders supply looks like

Close-up of temporary builders supply on a home in the Blue Mountains area
What temporary builders supply looks like up close on a typical Blue Mountains area home.
Signs that temporary builders supply needs attention
Typical signs that it needs attention.

Temporary Builders Supply in Blue Mountains: step by step

  1. Find a safe spotWe place the supply near the street, clear of machinery, slope and vegetation.
  2. PaperworkEndeavour Energy is notified by us, and you get the exact wording to give your retailer for the site meter.
  3. InstallTemporary pole or board installed, connected and tested.
  4. Change overNew home connected at handover; site supply removed.

Temporary Builders Supply questions in Blue Mountains

Something else on your mind? Call 02 9158 9989 and ask.

Our block falls away steeply from the road. Where does site power go?

Usually near the street, on the most level practical spot, with leads or a sub-board down to the build. We plan it with your builder.

Can the temporary pole be near the bush?

We keep it as clear of vegetation as the site allows and away from where machinery works.

Who sets up the meter?

You open a retailer account for the site; the retailer arranges the meter.

Need a Level 2 electrician in the Mountains?

📞 Call now Free quote