Skip to content
New raiser on a Blackheath home
Level 2 electrical

Point of Attachment Upgrade Blue Mountains

Raisers on iron roofs, brackets on weatherboard and soft brick, replaced and positioned properly.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

The point of attachment is where Endeavour Energy’s overhead service line, or your private line, meets your house. On a Mountains cottage it’s usually a galvanised raiser above an iron roof or a bracket on a weatherboard or brick wall. It carries the full tension of the line and sets how high the line sits over your path, deck and roof.

Why it needs work in the Mountains

Old fixings. Many cottages had their supply added decades after they were built, and the bracket or raiser was fixed into whatever was handy: weatherboard, soft brick, a verandah beam. Over time, fixings loosen.

Weather. Strong westerlies, heavy rain and occasional snow load up lines and fittings. Snow and ice on lines in the upper Mountains can bend raisers.

Falling limbs. Gum branches landing on the line pull fittings out of walls and roofs.

Re-roofs. Replacing old iron means the raiser comes out and goes back in, and it’s often due for replacement anyway.

Decks and extensions. New decks, balconies and second storeys can bring the line too close. The Service and Installation Rules of NSW set clearances from areas people stand on, and from roofs and windows.

If the fitting has pulled loose or the line is hanging low, keep clear and call our emergency level 2 electrician team.

Raisers and brackets

On single-storey cottages with iron roofs, a raiser fixed to solid roof framing is usually the answer. On two-storey homes, a bracket fixed into sound structure does the job. We check what’s behind the cladding before deciding, because a raiser is only as strong as what it’s fixed to.

Heritage homes

Leura, Katoomba, Blackheath and Wentworth Falls have many heritage-listed homes and conservation areas. We place new fittings as discreetly as the rules allow, paint them where appropriate, and avoid changes to street facades.

Combine it with the mains

Moving or replacing the attachment usually means extending or replacing the mains to the meter board. If they’re old, a consumer mains upgrade at the same time saves a second outage. For renovations, we do the power disconnection and reconnection and reconnect to the new fitting when the roof or extension is finished.

Clearances in plain terms

The line has to stay a minimum height over paths, driveways and roofs and a minimum distance from windows, decks and balconies. On steep Mountains blocks, where houses sit above or below the road, getting those clearances right takes careful placement.

On the day

We lodge the notification, disconnect, fit the new raiser or bracket, extend the mains and transfer the line, then reconnect, test and certify. Most jobs take half a day.

Signs it needs attention

A raiser that leans, rust bubbling at its base, cracked paint or timber around a bracket’s fixings, or a line that has dropped lower than it used to are all signs the attachment needs looking at. In the upper Mountains, check after any snow or heavy storm. A replacement now is far cheaper than repairs after a line comes down.

How long it takes

Most attachment jobs take half a day, with the power off for part of it. We schedule winter jobs for the middle of the day.

Weatherboard and stone

Fixing into weatherboard, old stone or soft early brick needs care. We find solid framing or masonry behind the cladding and use fixings suited to it, so the new raiser or bracket holds for decades.

Get a price

Call your level 2 electrician Blue Mountains team for a site visit and a fixed price. We replace a lot of raisers in level 2 electrician Blackheath after winter storms.

Updated

The price depends on the raiser or bracket, what it fixes into (weatherboard, brick, stone or roof framing), its height, and whether the mains need extending. We look on site and give you a fixed price.

What good point of attachment upgrade looks like

Close-up of point of attachment upgrade on a home in the Blue Mountains area
What point of attachment upgrade looks like up close on a typical Blue Mountains area home.
Signs that point of attachment upgrade needs attention
Typical signs that it needs attention.

Point of Attachment Upgrade in Blue Mountains: step by step

  1. Inspect the fittingWe check the raiser or bracket, its fixings and the line's clearances over paths, decks and roof.
  2. Choose the spotA position with a clean run from the pole, solid fixing and minimal impact on the house's look.
  3. Fit and transferNew raiser or bracket installed, mains extended, line moved across.
  4. ReconnectReconnected to the Endeavour Energy network, tested and certified.

Point of Attachment Upgrade questions in Blue Mountains

Something else on your mind? Call 02 9158 9989 and ask.

Our raiser is fixed to a weatherboard wall. Is that OK?

It depends on what it's fixed into behind the boards. Raisers need solid structure to carry the line's tension. We check and refix or relocate if needed.

Snow bent our raiser. Can it be fixed?

A bent raiser should be replaced, not straightened. Keep clear and call us.

We're in a heritage area. Can the bracket go somewhere less visible?

Often, as long as the line has a compliant path from the pole. We'll suggest the least visible option.

Need a Level 2 electrician in the Mountains?

📞 Call now Free quote